Projects

Our portfolio

Projects

Explore some of our recent remodeling and renovation projects — click through each one to follow the work from before to finished.

Licensed & insured
Veteran-owned values
ADA accessibility specialists
On time & on budget
5-star service

Driveway replacement

Driveway Replacement — Reliance St., Rochester, NY

A deteriorated asphalt and concrete driveway removed to subgrade and rebuilt from the base up, finishing as a smooth, durable asphalt surface with clean transitions to the sidewalk.

Before · demolition1 / 5Deteriorated driveway before replacement
During · base prep2 / 5Base preparation and grading
During · paving3 / 5New hot-mix asphalt installation
After4 / 5Finished asphalt driveway
After · transitions5 / 5Finished driveway edges and sidewalk transitions

Project type
Driveway replacement
Location
Reliance St., Rochester, NY
Services completed
Demolition, excavation, base prep, grading, drainage, asphalt install
Progression
Before → during → after

Kitchen remodeling

Kitchen Remodel — Greece, NY

An outdated kitchen taken down to the studs and rebuilt with custom cabinetry, granite countertops, a tile backsplash, updated lighting, and premium flooring.

Before1 / 8Kitchen before remodel in Greece NY
Before2 / 8Original kitchen layout before renovation
Before3 / 8Dated cabinetry and finishes before remodel
During · demolition4 / 8Kitchen demolition in progress
During · construction5 / 8Kitchen framing and construction phase
After6 / 8Finished kitchen remodel in Greece NY
After7 / 8Completed kitchen with granite countertops
After8 / 8Finished kitchen cabinetry and backsplash

Project type
Full kitchen renovation
Location
Greece, NY
Services completed
Demolition, cabinetry, granite counters, backsplash, flooring, lighting, plumbing, electrical
Progression
Before → during → after

Kitchen remodeling

Kitchen Remodel — Rochester, NY

A complete demolition and rebuild finished with quartz countertops, a tile backsplash, modern lighting, stainless appliances, and finish carpentry throughout.

Before1 / 4Original kitchen layout before rebuild
During · demolition2 / 4Kitchen demolition down to framing
During · construction3 / 4Kitchen rebuild in progress
After4 / 4Completed kitchen remodel Rochester NY

Project type
Full kitchen renovation
Location
Rochester, NY (Reliance)
Services completed
Demolition, cabinetry, quartz counters, backsplash, flooring, lighting, plumbing, trim
Progression
Before → during → after

ADA accessibility

ADA Bathroom Remodel — Greece, NY

An outdated bathroom rebuilt as a barrier-free, accessible space with a walk-in shower, grab bars, a built-in bench, heated tile floors, and a custom quartz vanity.

Before1 / 11Bathroom before ADA renovation
Before2 / 11Original bathroom fixtures before accessibility work
Before3 / 11Bathroom layout prior to ADA modifications
During · demolition4 / 11Bathroom demolition to framing
During · waterproofing5 / 11Waterproof membrane system installation
During · waterproofing6 / 11Shower pan waterproofing before tile
After7 / 11Finished ADA accessible barrier-free walk-in shower
Project detail8 / 11Bathroom with freestanding tub, tiled shower, and gold fixtures
Project detail9 / 11Custom tiled shower with recessed niche and gold fixtures
Project detail10 / 11Freestanding bathtub beside patterned tile and windows
Project detail11 / 11White vanity with open center space, vessel sinks, and gold-framed mirrors
Project type
ADA accessibility renovation
Location
Greece, NY
Services completed
Barrier-free shower, grab bars, shower bench, heated tile floor, waterproofing, quartz vanity
Progression
Before → during → after

Finished bathroom · Greece, NY

8 project photos
Finished Greece bathroom with double vanity and freestanding tub
Completed Greece bathroom with freestanding tub and tiled shower
Double vessel-sink vanity with gold-framed mirrors
Tiled shower and vanity in completed Greece bathroom
Open vanity knee space and tiled floor in Greece bathroom
Gold shower fixture control detail
Gold handheld shower fixture detail
Gold shower valve on hexagonal tile

Use Previous and Next, or swipe on your phone. Select a photo to view it full size.

View the full Greece project


Bathroom remodeling

Luxury Bathroom Remodel — Greece, NY

A full renovation that uncovered hidden water damage and mold during demolition, both remediated before rebuild, then finished with premium waterproofing, heated floors, and a custom walk-in shower.

Before1 / 6Outdated bathroom before luxury renovation
Before2 / 6Original fiberglass tub and dated finishes
During · demolition3 / 6Bathroom demolition revealing water damage
During · remediation4 / 6Mold remediation and structural repair
After5 / 6Finished luxury bathroom with walk-in shower
After6 / 6Completed bathroom with quartz vanity and tile

Project type
Full bathroom renovation
Location
Greece, NY
Services completed
Demolition, mold remediation, plumbing, electrical, waterproofing, heated floors, walk-in shower, ADA features
Progression
Before → during → after

Bathroom remodeling

Modern Bathroom Remodel — Rochester, NY

An aging layout with worn finishes and limited storage reworked into a bright, efficient bathroom with updated fixtures and a clean, timeless design.

Before1 / 6Bathroom before modern remodel
During2 / 6Bathroom construction progress
During3 / 6Tile and fixture installation in progress
During4 / 6Bathroom finishing work underway
After5 / 6Finished modern bathroom remodel
After6 / 6Completed bathroom with updated fixtures and storage

Project type
Full bathroom renovation
Location
Rochester, NY
Services completed
Demolition, tile, fixtures, vanity, lighting, improved storage
Progression
Before → during → after

Demolition & structural

Bathroom Demolition & Structural Repairs — Rochester, NY

The demolition and drywall preparation phase of a bathroom renovation — finishes stripped, framing exposed and repaired, and the space handed off clean and ready for the next stage.

Before1 / 5Bathroom condition before demolition
Before2 / 5Existing bathroom prior to tear-out
During · demolition3 / 5Fixtures removed and framing exposed
During · tear-out4 / 5Damaged drywall removed to studs
After · ready to rebuild5 / 5New drywall installed and surface prepared

Project type
Demolition & structural prep
Location
Rochester, NY
Services completed
Bathroom demolition, damaged material removal, framing repairs, new drywall, jobsite cleanup
Progression
Before → during → ready to rebuild

Whole home transformation

Complete Home Transformation — Greece, NY

A full interior and exterior renovation: new brushed-concrete driveway and walkways, new garage door and roof outside, with a custom kitchen, ADA bathroom, flooring, paint, lighting, and trim throughout the interior.

Before1 / 7Home before complete transformation
Before2 / 7Interior before whole-home renovation
Before3 / 7Original condition prior to renovation
After · exterior4 / 7Finished exterior with new roof and driveway
After · exterior5 / 7Aerial view of completed exterior renovation
After · concrete6 / 7New brushed-finish concrete driveway and walkway
After · interior7 / 7Renovated interior with new flooring and finishes

Project type
Complete home transformation
Location
Greece, NY
Services completed
Roofing, concrete driveway & walkway, garage door, kitchen, ADA bathroom, flooring, painting, trim, lighting
Progression
Before → after

Kitchen remodeling

Kitchen Remodel — Shortsville, NY

Updated cabinetry, new countertops, a decorative tile backsplash, and a modern sink and faucet, finished with clean carpentry and durable materials.

Finished1 / 4Finished kitchen remodel with tile backsplash
Finished2 / 4Updated cabinetry and countertops
Finished3 / 4Completed kitchen with modern sink and faucet
Finished4 / 4Kitchen finish carpentry detail

Project type
Kitchen remodel
Location
Shortsville, NY
Services completed
Cabinet installation, countertops, tile backsplash, sink & faucet, finish carpentry
Progression
Finished work

Flooring

Kitchen Floor Remodel — Rochester, NY

Outdated kitchen flooring replaced with durable modern tile, including floor preparation, underlayment, grout and finish work, and trim adjustments to match the existing cabinetry.

Before1 / 2Kitchen floor before tile replacement
After2 / 2Finished tile floor installation in kitchen

Project type
Flooring replacement
Location
Rochester, NY
Services completed
Tile installation, floor prep & underlayment, grout & finish work, trim adjustments
Progression
Before → after

Community Heroes appreciation program

Special discounts for veterans, active-duty military, first responders, teachers, healthcare professionals, and seniors — our way of giving back to those who serve others.

See if you qualify

Want your project on this page?

Tell us what you’re planning and we’ll walk the space with you — free estimate, no obligation.

Licensed & insured · Serving Rochester & surrounding communities

Scroll to Top